Last annotated on September 20, 2014
If there is someone who can find us a much better way,
it's a young person. Young enough to be rebellious, young enough to be
unsatisfied with our rules.
"Mark
will be your group leader," Levy adds. "We think he is open enough to
handle constructive criticism, knowledgeable and sensible enough to reject
impractical criticism, and pleasant enough to ensure harmony. Ruth is here due
to her exceptional integrity. You are going to find out to what extent she is
not afraid to ask questions. Fred is the rebel of finance. And at the same time
the most respected project auditor that we have. Your
mission is to find a way that will enable us to drastically cut our development
time.
They
say that smart people learn from their mistakes while wise people learn from
others' mistakes. It's
not any difference in substance, it's just the reputation.
Project
is "A set of activities aimed to achieve a specific objective and have a
clear start, middle and end.""Has
anybody else come across a project that due to its overruns and its being
overdue, compromised on its original specifications?" .The problems common to
all projects are: the high probability of, 1. Budget overruns; 2. Time
overruns; and many times, 3. Compromising the content."
"Select
a project in your company. A project that has recently finished or is about to
be finished. Interview the person running this project—the project leader. Interview the people
who did the actual work, and interview the bosses of the project leader.
Prepare two lists for class. One: the official reasons for the overruns. The
second: the unofficial reasons.
"Payback
is the time period from investing until we expect the fruits of our investment
to cover the investment. Corporate
mentality is always blaming the external world. All the explanations for all the problems have one
thing in common. It's somebody else's fault. All that we've heard is just a
long list of finger pointing. The lower the level of the person, the more
the finger points internally, rather than externally.
Uncertainty
is what typifies projects. We need to better manage the project.the
uncertainties embedded in the projects are the major causes of what we called
mismanagement. For every step in the project there is a time estimate; the
length of time, we estimate, it will take from the start of that step until
completion of that step.
The
higher the uncertainty the longer the tail of the distribution. "This is
the median of the distribution," I draw the line on the graph. "It
means that there is only a fifty percent chance of finishing at or before this
time." almost
nobody will choose an estimate they have a fifty percent chance of blowing. "The difference
between the median of the probability distribution and the actual estimate is
the safety we put in. Don't forget, the bigger the uncertainty, the bigger the
difference. Which
means that for each and every step of the project we factor in a lot of safety.
Go
back to the project you examined and pick, arbitrarily, at least three
different steps from that project. For each of the steps you selected find out how the
time estimate was arrived at. Don't
just ask the project leader. Find out who gave him or her the estimate and
interview the source." People do give their ‘realistic estimates' according
to their worst, past experience."
"In
production, most of the time parts spend in the plant they are waiting in
queues in front of machines, or waiting for another part in front of assembly. Most of the lead time
is not actual production, it's in wait and queue. "When you are in charge of an omelet you have to
break eggs." the
lower the position of the manager the more the finger points not just outside
the company but inside as well.
The
major, negative financial ramification does not stem from spending too much
money." Companies
are so immersed in the mentality of saving money that they forget that the
whole intention of a project is not to save money but to make money. "The critical
path," I remind the class, "determines the time it will take to
finish the project. Any delay on the critical path will delay the completion of
the project. That's why the project manager must focus on it."
"the
decision of the planner when to start each path. Brian chose the late start for
picking the vendors while Ted has chosen the early start." Concentrating on
everything is synonymous with not concentrating at all.
"The
first one, as we all suspected, is that TOC is actually a new management
philosophy."
"The
second, and most important breakthrough of TOC, at least in my eyes, is the
research methods it introduces.
"And
the third breakthrough is, of course, the one TOC is known for the most, its
broad spectrum of robust applications."
"New
management philosophy, new research methods and robust applications.
In
order to manage well, managers must control cost, and at the same time,
managers must protect throughput—they must ensure that the right products will
reach the right clients in a way that they will pay for them." "It implies a
management philosophy. It implies that any local improvement automatically
translates into an improvement of the organization. Which means that to
achieve the global improvement, the improvement of the organization, we know
that we have to induce many local improvements. I call it the ‘cost
world." We have managed according to the ‘cost world' probably since the
beginning of the industrial revolution."
‘protecting
throughput' implies a contradictory philosophy. It implies the ‘throughput
world.'When we deal with throughput, it is not just the links that are
important; the linkages are just as important. Most of the local improvements
do not contribute to the global! Manager who does not know how to focus will
not succeed in controlling cost and will not protect throughput.
But
what is focusing for us? We have come to know it as the Pareto principle. Focus
on solving twenty percent of the important problems, and you'll reap eighty
percent of the benefits. This is a statistical rule. But those who teach
statistics know that the twenty-eighty rule applies only to systems composed of
independent variables; it applies only to the cost world where each link is
managed individually. Linkages are important, the variables are dependent.
The Pareto principle is not applicable.
TOC
first step is IDENTIFY constraint. Since TOC accepts ‘controlling cost' as an
absolute necessary condition, no wonder that it elects the second step to be:
Decide how to EXPLOIT the system's constraint(s).
Step
three: SUBORDINATE everything else to the above decision. If this first gentleman
is still a bottleneck and we do want more throughput, we must lift some of the
load from his shoulders. Even if it means buying more machines or hiring more
people. When everybody agrees, he writes the fourth step: ELEVATE the systems'
constraint(s). Step five: I have to avoid inertia and go back to step one.
Have
you noticed something fascinating?
TOC
adopts the definition accepted in the accurate sciences. A problem is not
precisely defined until it can be presented as a conflict between two necessary
conditions. We all asked the non-bottleneck to produce much less than he can,
not in order to protect throughput, but in order to control cost.
"Tell
me how you measure me and I'll tell you how I'll behave."
There
was a real, true consensus that the core problem, the constraint of the
company, was the fact that their prime operational measurement was
tons-per-hour. It
was very good news, because all their competitors suffered from exactly the
same core problem. Correcting it would give this company a tremendous
advantage.
In
academia we don't call it compromise, we call it optimize. the higher the
uncertainty, the higher the resulting safety.As far as we can tell, there are
three different mechanisms by which safety is inserted into the time estimates
of almost every step of a project.
The
first one is that the time estimates are based on a pessimistic experience, the
end of the distribution curve. The second is that the larger the number of management
levels involved, the higher the total estimation, because each level adds its
own safety factor. And
the third is that the estimators also protect their estimations from a global
cut. When
you add it all up, safety must be the majority of the estimated time for a
project.
A
delay in one step is passed, in full, to the next step. An advance made in one
step is usually wasted. If we could find a way to put the safety only where
it's needed... Multi-tasking is probably the biggest killer of lead time. We
found three mechanisms to put safety in. Now it seems that we also found three
mechanisms to waste that safety. One we called the student syndrome, there is
no rush so start at the last minute. The second is multi-tasking. The third
involves the dependencies between steps; these dependencies cause delays to
accumulate and advances to be wasted.
If
we want to utilize even one resource to one hundred percent, all its feeding
work centers have to have more capacity. Work-in-process inventory and lead time are twin
brothers. In production we protect a work center with inventory, in projects we
protect a step with safety time. If there is a stoppage, inventory does not
disappear. In projects, time is gone, forever. In an assembly line one work
center goes down and very quickly it stops the whole line. The only place that
we want one hundred percent efficiency, the only place that needs protection,
is the bottleneck.
If
we tie the first soldier to the bottleneck, then the first row will be forced
to walk at the rate of the bottleneck. That's good, spreading of the troop is prevented. All
the other soldiers, being faster than the bottleneck, will jam pack, some
behind the first row, the others behind the bottleneck. So the troop will
spread over a distance that will be almost equal to the length of the rope we
choose. That's neat. It
will also guarantee that there is a gap before the bottleneck, so if one of the
upstream soldiers stops, the bottleneck can still proceed. The inventory, the
safety, accumulates there.
First
you identify the bottleneck. Then you choose the length of the buffer. Usually
a good rule of thumb is to take the current production lead time and cut it in
half. A
bottleneck is a resource with capacity that is not sufficient to produce the
quantities that the market demands. In this way the bottleneck prevents the
company from making more money.
It's
one thing to agree that theoretically there is more than two hundred percent
safety. It's another thing to commit to a trimmed estimate. Inertia. The ‘feeding buffer'
protects the critical path from delays occurring in the corresponding
noncritical paths. But when the problem causes a delay bigger than the feeding
buffer, the project completion date is still protected by the ‘project buffer.'
"Sometimes
everything is ready for a step on the critical path except for the appropriate
resource, which is still busy doing something else." They invent the
resource buffer. We
changed the way we measure progress. Progress for us is now measured only on
the critical path; what percent of the critical path we have already completed.
That's all we care about. Eliminating the false alarm and actually shrinking
the time it takes to perform a step contributed a lot to the reduction of
multi-tasking. On
the critical path, when everything else is ready we must make sure, in advance,
that the resources will be ready.
idea of resource buffer: A
week before the expected time we just remind people that their work on the
critical path is coming. Then
three days ahead we give another reminder. And then again, one day before, when we know for sure
that everything else is going to be ready. The important thing is that people know that when the
time comes they must drop everything and work on the critical path.
One.
Persuading the various resources to cut their lead time estimates; Two.
Eliminating milestones or, in other words, eliminating completion due dates for
individual steps, and Three. Frequent reporting of expected completion times.
Most
people involved in a project don't explicitly recognize the penalties
associated with each month that the project is delayed. Most people involved in
the project, often including the project leaders, are not fully aware of the
magnitude of damage associated with a delay. No wonder that when we negotiate with vendors or
subcontractors we do not pay enough attention to their lead time. "if in
your request for proposals you write a sentence like ‘above X price don't
submit, above Y lead time don't submit a proposal.'
So
there is a way to trade lead time for money, The
vendor is willing to commit to much shorter lead times, for money. The chance
of a piece of bread falling with the butter facing down . . . is directly
proportional to the price of the carpet. You have to offer money for lead time. One way to ‘encourage'
a contractor to reduce lead time is to attach big bonuses to early completion
and big penalties to delays. All our fast contractor has to do is persuade the
developer to put, in the request for proposal, a demand for relatively short
lead times and hefty penalties. The developer will get a much higher return on
his investment with much less risk, and the fast contractor will make much more
profit.
The
longest chain of dependent steps, the longest in time. Don't ignore the limited
capacity of X. Don't ignore the fact that dependencies between two steps can be
because they are performed by the same resource that has limited capacity, so
you cannot do both steps at the same time; you must do them sequentially rather
than in parallel. That is dependency. Dependencies between steps can be
a result of a path or a result of a common resource. Why are we so surprised
that both dependencies are involved in determining the longest chain of
dependent steps? In general, the longest chain will be composed of sections
that are path dependent and sections that are resource dependent.
Let's
leave critical path to be what everyone else calls a critical path, the longest
path. But we know that what counts is the constraint, and the constraint is the
longest chain of dependent steps. Since we must acknowledge that dependency can be the
result of a resource, we better provide another name for the chain of steps
that are the constraint.(=Critical Chain). It is a mistake to strive for
accurate answers when the data is not accurate. Bringing up resource contention as something we must
consider. There are projects where the contentions are too big for our feeding
buffers to absorb.
But
there is a difference between considering resource contention and fiddling
around with optimizing the schedule of these resources. Since you changed the
constraints, you must change the feeding buffers in accordance. Resource X is
not loaded for the entire time of the project. If you examine the details of his work you might find
that some of his activities can be done much earlier or later. "If there
is resource contention, the critical chain might be very different than the
critical path. Once
all contentions are removed, and I promise not to spend too much time playing
with the sequence, then we identify the critical chain. Resource contention
means that the same resource is supposed to do two different steps at the same
time. Every time there is a queue of tasks in front of a machine and the
priorities are unclear, we have resource contention; a few tasks are fighting
to be processed at the same time by the same resource.
Identify
the bottleneck,
Then
exploit it; schedule the sequence of work for the bottleneck. You have
eliminated any contention on the constraint. You don't ask it to do two things
at the same time.
And
then subordinate. Subordinate all the other resources to it. You have removed
most of the overloads from the other resources. And the sporadic peaks of load
that still exist can be absorbed by the buffers.
every
project we have steps done by digital processing," Fred elaborates.
"The schedule of the digital processing gave specific start and finish
dates for these steps. So, for each project we first did the work as if no
other project existed. You
know, removing any major contentions. Then we adjusted the project to fit the
digital processing dictates. All the buffers that we've talked about so far,
project buffer, feeding buffers and resource buffers, are all protecting the
individual project. Here we have to remember to also protect the bottleneck,
the overall performance of our organization. We had to insert another buffer,
the bottleneck-buffer. It's not as big a deal as it sounds. We decided that two
weeks is more than enough, for us it is, and every path that goes through
digital processing we schedule to start two weeks earlier. If a resource
contention starts to exhaust one feeding buffer after another, we'll know. But
only then will we declare it as another resource constraint, not a minute
before.
Payback
calculations do not properly take into account the most important factor, the
scarcity of money. Both will give you two years' payback, but one requires an
investment of one million dollars and the other ten million.
Net-present-value
is the way to translate future investments and income into terms of current
money. This method takes into account that interest and inflation exist. To estimate
the value of investment this method uses interest, but we just said that as
long as availability of money is a constraint, interest is not the appropriate
measure.
We
think in terms of time or money. We are not used to thinking in terms of
time-money. Payback
period is trying to give the answer in terms of time—two-years, three-years payback. Net-present-value is
trying to give the answer in terms of money, of dollars. The answer can only be expressed in terms of
time and money, together, not separate."
"Physicists
know that one of the most important rules is conservation of momentum. They
know that the summation of the masses of all the parts in a system, each
multiplied by their corresponding velocity, is conserved, no matter what
happens inside the system.
Suppose
you invest two dollars. After one day, you are invested for two dollar-days. Now suppose that at
the beginning of day eleven you invest another three dollars. In total I'm invested
for twenty-five dollar-days.
on
the morning of day twelve you got your five dollars paid back. Assume no
inflation or interest. Are you satisfied?
"No,
I'm not. I tied up my money for a period of time, I got back my money, but I
didn't get any value for the fact that the money was tied up. You invested
twenty-five dollar-days. You got back your five dollars, but you are still
twenty-five dollar-days in the hole. As long as this investment is not returned,
you rightfully are not satisfied.
"I
call it ‘flush,"' Charlene almost giggles. "To be satisfied, you must
make sure that you at least flushed out your investment. I stress it because at
the end of the payback period, when everybody tells you to be satisfied that
you got your money back, that's exactly the point in time that you are invested
the most, when you are the deepest in the hole in terms of dollardays.
Money
is measured in dollars, investment in dollar-days.